ACCUMULATORs DISASSEMBLY/ASSEMBLY


A6E561419200A01

1. Disassemble in the order indicated in the table.

2. Assemble in the reverse order of disassembly.

1

Servo apply accumulator

2

Servo apply accumulator large spring

3

Servo apply accumulator small spring

4

Forward accumulator

5

Forward accumulator large spring

6

Forward accumulator small spring

Assembly Procedure

1. Measure the spring free length.

Spring

Outer diameter mm {in}

Free length

mm {in}

No. of coils

Wire diameter

mm {in}

Servo apply accumulator large spring

21.0 {0.827}

67.8 {2.669}

10.3

3.5 {0.138}

Servo apply accumulator small spring

13.0 {0.512}

67.8 {2.669}

17.1

2.2 {0.087}

Forward accumulator large spring

21.0 {0.827}

75.0 {2.953}

10.7

2.3 {0.091}

Forward accumulator small spring

15.6 {0.614}

49.0 {1.929}

7.7

2.4 {0.094}

2. If not as specified, replace the spring.

3. Install the forward accumulator small spring, forward accumulator large spring and forward accumulator.

4. Install the servo apply accumulator small spring, servo apply accumulator large spring and servo apply accumulator.